Methane Recovery and use at Grantham Piggery

  • 94 pages

  • Published: 11 Dec 2012

  • Author(s): Skerman, Alan , Collman, Gary

Share this content
  • twitter
  • facebook
  • email
  • Download report PDF

    Download
  • Purchase a hard copy - AUD $55.00

This project involved upgrading the biogas extraction system originally installed in conjunction with a partial floating cover, retro-fitted to the primary anaerobic pond at the QNPH Grantham piggery. Following the system upgrade, this project also included installing a biogas reticulation pipeline to supply biogas from the extraction system, to a water heating system used to heat water circulated through underfloor heating pads in the piggery farrowing sheds.
This biogas fired water heating system has the potential to significantly reduce on-farm energy costs by replacing a significant proportion of the Liquid Petroleum Gas (LPG) previously used for farrowing shed heating.