Asparagopsis taxiformis hatchery and cultivation manual
The emerging Australian seaweed industry is becoming prominent and attractive because of the role it can play in helping Australian agriculture realise its sustainability goals....
94 pages
Published: 11 Dec 2012
Author(s): Skerman, Alan , Collman, Gary
Download report PDF
DownloadPurchase a hard copy - AUD $55.00
This project involved upgrading the biogas extraction system originally installed in conjunction with a partial floating cover, retro-fitted to the primary anaerobic pond at the QNPH Grantham piggery. Following the system upgrade, this project also included installing a biogas reticulation pipeline to supply biogas from the extraction system, to a water heating system used to heat water circulated through underfloor heating pads in the piggery farrowing sheds.
This biogas fired water heating system has the potential to significantly reduce on-farm energy costs by replacing a significant proportion of the Liquid Petroleum Gas (LPG) previously used for farrowing shed heating.